Commitment
Our quality commitment
In the steel manufacturing industry, quality assurance for a supplier is not about claiming factory control. It is about disciplined supply-chain control. We select mills based on certifications and performance, verify every mill test certificate before shipment, inspect incoming materials and coordinate third-party inspection when the project requires it.
The same documented process applies across hot rolled and cold rolled sheet and coil, steel plate, stainless flat products and aluminium sheet and plate: EN 10204 documentation, dimensional verification, visual checks and full heat-number traceability.
See how we export stainless flat products with grade, finish, MTC, inspection, packing and Incoterm reviewed before quotation.
Supplier role: review, verification and documentation
SteelFromTurkey's role covers order review, MTC verification, incoming inspection and export documentation: confirming that the selected Turkish mill, material documents, markings and shipment package match the buyer's order.
Document-first quality control
Steel grade, heat number, standard, test results, dimensions and quantity are checked against the purchase order before export documents are finalized.
Inspection scope before pricing
MTC type, third-party inspection, NDT, dimensional tolerances and packing requirements must be defined before quotation so the right supply route is selected.