Supplier role, not empty claims
We do not replace the mill's production controls. We verify that the selected Turkish mill, material documents, markings and shipment package match the buyer's order.
Steel quality from Turkey
SteelFromTurkey is a Turkey-based steel supplier and exporter focused on delivering verified steel quality from certified Turkish mills to international buyers.
Our role is supply-chain control: mill qualification, MTC verification, incoming inspection, document matching and third-party inspection coordination when your project requires it.

Commitment
In the steel manufacturing industry, quality assurance for a supplier is not about claiming factory control. It is about disciplined supply-chain control. We select mills based on certifications and performance, verify every mill test certificate before shipment, inspect incoming materials and coordinate third-party inspection when the project requires it.
The same documented process applies across quality sheet metals, quality pipe and tube, structural profiles, stainless steel and aluminium: EN 10204 documentation, dimensional verification, visual checks and full heat-number traceability.
We do not replace the mill's production controls. We verify that the selected Turkish mill, material documents, markings and shipment package match the buyer's order.
Steel grade, heat number, standard, test results, dimensions and quantity are checked against the purchase order before export documents are finalized.
MTC type, third-party inspection, NDT, dimensional tolerances and packing requirements must be defined before quotation so the right supply route is selected.
Certifications
SteelFromTurkey is the export trade name of RAM SAC Metal Fikstur Aparat Kalip Sanayi ve Ticaret Limited Sirketi. The ISO 9001:2015 certificate shown here covers the quality management system under which all SteelFromTurkey export operations are conducted. 3-year certification cycle with annual surveillance audits. Re-certification date: May 2028.
Partner mills are separately checked for product-level certifications and accreditations such as API Monogram, CE marking, TSE approval, ISO management systems and PED where applicable. Mill certificates are verified during supplier qualification and re-confirmed at order level.
Quality management procedure coverage for order review, customer communication, supplier control, incoming inspection and complaint handling.
Product-level mill documents are checked by product family: API for line pipe and OCTG, CE for construction steel and PED for pressure-related products.
Certificate scope, validity and product relevance are reviewed before the material is presented to the buyer as compliant.
MTC
A mill test certificate is the official document issued by the steel manufacturer confirming that the supplied material complies with the ordered specification. SteelFromTurkey does not issue mill test certificates; our role is to request, collect and verify the MTC from the producing mill.
MTC verification checks the steel grade and standard, chemical composition, mechanical properties, heat number, dimensions, quantity and required test results against the original order specification.

| Type | Issued By | Verification | Typical Use |
|---|---|---|---|
| EN 10204 2.1 | Manufacturer | Declaration of compliance without test results | Low-criticality general use |
| EN 10204 2.2 | Manufacturer | Declaration with non-specific test results | Standard commercial applications |
| EN 10204 3.1 | Manufacturer | Specific inspection with test results by the manufacturer's authorized representative | Most B2B steel orders |
| EN 10204 3.2 | Independent body | Independent inspection body verification | Critical pressure, oil and gas, nuclear or marine applications |
Control workflow
Steel quality for a B2B supplier depends on process discipline. Our workflow applies the same control points whether the order is hot rolled coil, steel plate, stainless sheet, structural pipe or a mixed shipment.
Incoming inspection covers document matching, marking verification, quantity confirmation and visual surface checks. Dimensional checks are performed or verified where the product standard and order tolerance require them.
| Control Point | What We Check | Why It Matters |
|---|---|---|
| Supplier qualification | Certification status, product range, capacity, past performance and defect history | Prevents unverified mill sourcing |
| MTC review | Grade, standard, heat number, chemistry, mechanical values and test results | Confirms document compliance before shipment |
| Incoming inspection | Marking, quantity, bundle count, surface condition and packing condition | Catches mismatch or transport damage early |
| Dimensional checks | OD, wall thickness, length, flatness, width, thickness and tolerances where relevant | Controls acceptance against product standards |
| Third-party inspection | SGS, Bureau Veritas, TUV, Lloyd's Register or buyer-nominated inspection scope | Adds independent verification for critical orders |
Standards
Our supply program covers products manufactured to international standards. Standard selection depends on product type, application, destination market and buyer specification.
| Product Area | Common Standards | Typical Products |
|---|---|---|
| Steel sheet and plate | EN 10025-2, EN 10111, EN 10029, ASTM A36, ASTM A572 | S235JR, S275JR, S355JR, DD11-DD14, A36, A572 Gr 50 |
| Stainless sheet and plate | EN 10088, ASTM A240 | 304, 316, 316L sheet, plate and strip |
| Pipe and tube | API 5L, ASTM A53, ASTM A106, EN 10219, EN 10210, EN 10217, ASTM A312 | Line pipe, hollow sections, pressure tubes and stainless pipe |
| Welding and coating | EN ISO 3834, AWS D1.1, ISO 1461, ASTM A123, EN 10346 | Welded fabrication, galvanized products and coated flat steel |
Traceability
Every shipment is prepared with a document package aligned with the buyer's RFQ and destination requirements. Heat numbers on the product marking are matched against the MTC so material can be traced back to the production batch.
Digital copies are retained for documentation retrieval after shipment. Original MTCs and inspection certificates are provided with the cargo or sent separately when the purchase order requires it.
| Document | Standard Scope | Available On Request |
|---|---|---|
| Mill test certificate | EN 10204 3.1 for standard orders | EN 10204 3.2 independent inspection certificate |
| Commercial documents | Commercial invoice, packing list, certificate of origin and weight certificate | Insurance certificate, bill of lading review and buyer-specific document pack |
| Inspection records | Internal document and marking checks | SGS, Bureau Veritas, TUV, Lloyd's Register or buyer-nominated inspection report |
| Packing records | Bundle labels, weights, quantities and package identification | Fumigation certificate for wooden packaging when required |
Certificate details
| Certificate shown | ISO 9001:2015 Quality Management System certificate for RAM SAC Metal Fikstur Aparat Kalip Sanayi ve Ticaret Limited Sirketi |
|---|---|
| Certificate number | IQR.0025-QMS.01072 |
| Issue date | 16.05.2025 |
| Validity date | 15.05.2026 |
| Scope | Buying, selling, manufacturing, import and export of iron and steel products, sheet metal, zinc, brass, copper, galvanized sheet, ingot, profile, U iron, L iron, flange and pipe fittings |
| Standard shipment documents | EN 10204 3.1 MTC, invoice, packing list, certificate of origin and weight certificate |
| Optional inspection documents | EN 10204 3.2 certificate, SGS / Bureau Veritas / TUV / Lloyd's Register inspection report and buyer-specific checklists |
Quality workflow
Check certification status, product capability, size coverage, grade availability and past performance.
Match grade, standard, heat number, chemistry, mechanical values, dimensions and test results to the order.
Review marking, quantity, surface condition, packing and key dimensions before export documentation.
Send verified MTCs and shipment documents to the buyer before final cargo release.
Quality RFQ
Share the certificate, inspection and documentation scope before quotation so the right Turkish mill route can be reviewed from the start.
Buyer controls
The RFQ is reviewed for MTC type, inspection scope, tolerance, testing, marking and packing before the supply route is confirmed.
Turkish mills and supply partners are checked for certificate status, product capability, previous performance and document reliability.
Material documents, shipment documents and marking records are reviewed as one package before cargo is released.
FAQ
We qualify mills based on certification status, production capability and past performance. Every order includes EN 10204 mill test certificate review, incoming material inspection and optional third-party inspection through SGS, Bureau Veritas, TUV or buyer-nominated agencies.
Yes. Buyers can nominate their own inspection agency or use our coordination with SGS, Bureau Veritas, TUV or Lloyd's Register. Inspection can take place at the mill before dispatch or at the warehouse before export shipment.
Partner mills follow the applicable product standard and welding quality procedures such as EN ISO 3834 or AWS D1.1 where relevant. Welded pipe production can include inline weld inspection, hydrostatic testing and NDT when specified by the buyer or required by the standard.
EN 10204 3.2 certificates are issued by an independent inspection body, not by the mill or supplier. SteelFromTurkey coordinates 3.2 inspection upon request for critical applications. Standard orders normally include EN 10204 3.1 mill test certificates.
Standard documentation includes mill test certificate, commercial invoice, packing list, certificate of origin and weight certificate. Additional documents such as third-party inspection reports, fumigation certificates and insurance certificates are available upon request.
Mill test certificates are commonly required by project specifications, standards and customs processes for steel products. We include EN 10204 3.1 MTCs as standard to support customs clearance, buyer approval and project documentation.
Final CTA
Share the certificate, inspection and documentation scope before quotation so the right Turkish mill route can be reviewed from the start.